Compliance & Documents

Compliance & Documents:Quick Approval Review

First barrier to premium manufacturing and export orders isn't price,Are you ready?。Here are the grades we can offer、Export what files、Within a few working days——No Filters"Available"Empty talk。

3.1certificatesEN 10204 Included with the shipment
5Working daysRoutine Test Report
Batch BurnSearch AvailableTrace Back to Rolling Batch
Third partySGS / BV / TÜV Bookable

Matrix:What do you need?、How long until shipment?

File / Authenticationsuitable for scenariosWe offerIssuance Time
EN 10204 3.1 materialcertificatesBasics for EU and majority export ordersIncluded with the shipment,IncludeBatch BurnEnter Number、Chemical composition、Mechanical PropertiesPack with / 1 working day
EN 10204 3.2Pressure vessels、Owner specifiedThird partyWitnessissued by a duly accredited inspection agency(We coordinate sample submission)5–10 working days
PED 97/23/EC Compliance MaterialsPressure equipment for export to EUMaterials meet PED Appendices required + 3.1 certificatesPack with(Special Grades, Please Negotiate)
FDA 21 CFR / EU 1935/2004Food Contact(Counter、Tank Body、Conveyor Parts)Declaration of Compliance + Third partyMigrateTest(Select Products)DisclaimerPack with / Test 7–10 Sky
RoHS / REACHElectronic、Appliances、Export to EUDeclaration of Compliance;Provide as neededThird partyReport1–3 working days
Third partyRe-inspectionCustomer Specification SGS / BV / TÜV / Classification SocietySchedule Inspection、Companion、Share ReportSort by Schedule by Institution(Usually 5–15 Sky)
Size and appearance inspection recordsCustom piece inspection and batch acceptanceRecord items according to the drawing specifications(Upload Photos)Pack with
Special Grades (e.g. 904L, 254SMO, Dual-phase 2507) with ultra-thick specifications certificates take longer., Please quote separately.Don't hide."It's fine."This Response。

Trace Back Chain:FromBatch BurnEnter NumberTo Your Finished Product

① Batch BurnEnter NumberFoundry,RecordChemical compositionConnectMechanical Properties;This is allFileGet started。
② rolling batchSerial Number / PlatesEnter NumberConnectBatch BurnEnter NumberBind,Record thickness、Width、surface condition。
③ Processing BatchCutting、Open Peace、Bend、Welding Steps CardConnectInspection Records,Bind to Specific Order。
④ Finished ProductsConnectPackagingFinished tags include order number + Batch Number;Packaging List and Shipping Document Reverse Lookup for Steps 1-3。

What are the most common questions?(We ship ahead.)

Are you a steel plant??certificatesWho signs?
We are application engineering service providers,Rolling done by cooperating mills。3.1 certificatessigned by actual manufacturing factory(Here we gocertificateson premise);We are responsible for the quality of the finished product.。
Can we provide recently? 12 Months of similar material test report?
Can ship,De-sensitized Offer(Hide Customer Name and Price)。Send for re-inspection according to your standards。
For batchesunqualified?
Based on the first piece confirmation sheet and material book:Return and Exchange、restock available、Foldable,Quality terms in the contract,Maximum claim is usually the value of the batch。
suitable for customers orThird partyCome audit?
Can ship, Support on-site, Accept client, commissions, Third-party, inspection, (Advance booking, required 3, working days), Book an, appointment
FileCan we get a sample first??
Can ship。Tell us your target market and industry,We send a set of desensitized samples(3.1 certificates + Inspection Records + Declaration of Compliance)。

Next step

Added to inquiry list